Schneider Engineering & Consulting worked as the marine construction contractor for this renovation project. The Targa Resources project included demolishing Dock 2A, removing designated breasting and mooring dolphins, dredging to -40 feet to construct Dock 4, and partially rebuilding the existing approach as a pile-supported concrete dock parking area for the existing Dock 3 and the new Dock 4.

Our team executed the Targa Resources plan, performed all marine structure engineering and coordination services for Docks 2 and 4. We designed the breasting and mooring installation to handle vessels up to 750 feet long and oversaw design and installation of a 20-ton deck-mounted crane, two loading arms, and platform accommodations for future loading arms.