Location: Puerta Maya, Cozumel
Project PDF: Read More
We provided design-build services for this 486-foot by 40-foot pier extension project to provide mooring and berthing for Royal Princess Class cruise ships. Schneider Engineering & Consulting also acted as the marine construction contractor for a 520-foot by 30-foot bridge between the existing pier and the new pier. In addition to these structures, our efforts also included an intermediate multi-pile supported breasting dolphin, and four large-diameter mono-pile mooring dolphins. Our team engineered the access bridge, pier, and structures to have a design life of 50 years.