This project involved the design, permitting and preparation of construction documents for the clearing and
Berth 214 Uplands Phase I, Tampa, Florida

This project involved the design, permitting and preparation of construction documents for the clearing and
This project involved the design, permitting and preparation of construction documents for the clearing and
Port Redwing is a 150-acre greenfield site at the Port of Tampa that is being
Southbay is a 115-acre industrial site that Port of Tampa will develop for future industrial
Port Redwing is a 150-acre greenfield site at the Port of Tampa that is being
Florida Department of Transportation hired Orion Marine Group (OMG) to construct two high-level fixed bridges
Port Redwing is a 128-acre greenfield site at the Port of Tampa that is being